home
location infrastructure facilities site plan
lot size tenants contact us career business
   
Street Area
The street where asphalted hotmixly with the Row of 14 M width and trees on the left and right sides, it supports mobilize transportation such as container truck of 40 feet on the area and it is not a public street.
Green Belt
Planting or open space provided as balancing to the lot that built.
Telecommunications Lines
Capacity 400 lines with Jakarta exchange number
Electricity
Ready to use under recommended of PT. Bogorindo Cemerlang supplied by PLN its capacity is 18 MW, PT. Bogorindo Cemerlang distributes a standard voltage of 20 KV, its installed underground between fence and drainage area.
Drainage
It sets by management along the right and left side streets area, flow the rain water and house water to the river.
Public illumination
Every 50 M distance, it installed at breadth along the street area and necessary place.
Hydrant
Large pipes to take water to prevent fire configuration, installed between lot fence and drainage area spread at every 200 meters along side's street area.
Deep well water
Clean water is obtained by build Artesian well, its reacheable within 100 meters below to ground level, has been survey by PT. Indeco Prima requirements conform with Department of Health's standards and the analysis test result of sampling water is can be drink and use for its necessity of production or others.